property_gallery_img

JOY 3 SITE

Price on call
property_gallery_img_5726
property_gallery_img_5727
property_gallery_img_5728
property_gallery_img_5729
property_gallery_img_5730
property_gallery_img_5731
property_gallery_img_5732
property_gallery_img_5733
property_gallery_img_5734
property_gallery_img_5735
property_gallery_img_5736
property_gallery_img_5737
property_gallery_img_5738
property_gallery_img_5739
property_gallery_img_5740
property_gallery_img_5741
property_gallery_img_5742
property_gallery_img_5743
property_gallery_img_5744
property_gallery_img_5745
property_gallery_img_5746
property_gallery_img_5747
property_gallery_img_5748

Description

Parkin Properties served as both the client and lead contractor for the Proposed Construction of a Residential Development in Pipeline, demonstrating our commitment to investing in and delivering high-quality urban housing. This 40 million KES project commenced on 19th October 2022 and was successfully completed by 22nd March 2025. By managing this internal development, we maintained total control over construction standards and architectural finishes, resulting in a modern residential complex designed for durability and optimal space utilization. This project stands as a flagship example of our ability to deliver large-scale residential infrastructure that meets the specific housing needs of the Nairobi market.

Overview

ID

5722

Type

Construction Project

Year Built

19th October 2022 to 22nd MARCH 2025

Additional Overview

  • Project Proposed construction of Residential development.
  • Client Parkin Properties
  • Contractor Parkin Properties
  • Location Pipeline, Nairobi Kenya
  • Commencement 19th October 2022 to 22nd MARCH 2025
  • Contract Sum 40 MILLION

Property Attachments

Leave a Reply

Your email address will not be published. Required fields are marked *

Leave your message

© 2026 Parkin Properties. All rights reserved.

Compare